To continue using this website you need to accept the use of cookies. We use cookies for functional and analytical purposes.

Sibraxis
  • PROJECTS
  • ABOUT
  • CONTACT
  • HOME
  • ABOUT
  • CONTACT

Companies

  • BOBOTIS+BOBOTIS Architects
    Award Winning Architectural Practice
  • JEPA
    MECHANICAL & ELECTRICAL ENGINEERING, SUSTAINABILITY & ENERGY CONSULTING, SECURITY & SAFETY, RENEWABLE ENERGY
  • NAMA
    WATER & ENVIRONMENT, TRANSPORT ENGINEERING, SURVEYING & GIS, STRUCTURAL ENGINEERING, GEOLOGY & GEOTECHNICS
  • TRITON
    PORT & OFFSHORE ENGINEERING, COASTAL, PIPELINE, TRANSPORT, GEOTECHNICAL & STRUCTURAL ENGINEERING, ENVIRONMENTAL, FEASIBILITY & PLANNING STUDIES
  • MHXME
    Effective Engineering Solutions.
  • TTA
    Effective Engineering Solutions.

News

News./ EVENTS, PRESS, AWARDS

June
23

NEW PORT AND MARINA, AT MYKONOS (408)

June
23

NOVOROSSIYSK TIMBER AND CONTAINER TERMINAL (686)

June
23

OILSEED CRUSHING PLANT AT ILYICHEVSK PORT (748)

June
23

RODOS’ MARINA (813)

June
23

RABIGH S070 MARINE LOADING / LIQUID BERTH (856)

June
23

NEW PORT OF PATRAS (884)

June
23

TECHNICAL ASSISTANCE & SUPERVISION TO THE MINISTRY OF PUBLIC WORKS FOR THE EXTENSION OF THE 10-28 RUNWAY (& TAXIWAY) OF THE THESSALONIKI AIRPORT (979)

June
23

PROJECT MANAGEMENT FOR THE CONSTRUCTION OF THE NEW PORT OF IGOUMENITSA,1ST,2ND & 3RD PHASE(987/1029)

June
23

LIMASSOL PORT CONTAINER TERMINAL (1008)

June
23

GYPSUM AND SEA WATER RETURN JPH IN JORF LASFAR PROJECT (1042)

June
23

TECHNICAL CONSULTANTING SERVICES DURING THE CONSTRUCTION OF MARINE WORKS FOR THE SAMSUN COMBINED CYCLE POWER PLANT (1058)

June
23

MARINE WORKS FOR SHOAIBA II 1440MW CCPP (1054)

June
23

NEW FISHING PORT AT DILA LIBYA (948)

June
23

INSPECTION & TECHNICAL ASSESSMENT SERVICES OF THE RAIL LINK SPAN AT THE PORT OF POTI (4014)

June
23

OFFSHORE COOLING WATER PIPELINE SYSTEM (4022)

June
22

Sewerage Project of Eastern and Western Section of Thriassion Pedion

June
22

DEVELOPMENT AND GEHABILITATION OF THE BULQIZA AND THE ELBASAN AND BARREL FERROCHROME FURNACES (756)

June
22

FEASIBILITY STUDY, DUE DILIGENCE REPORT & MARKET RESEARCH FOR THE NKHP GRAIN TERMINAL IN MYKOLAYIV PORT (1246B)

June
22

FEASIBILITY STUDY, DUE DILLIGENCE & MARKET RESEARCH FOR THE NOVOTECH’S GRAIN DEVELOPMENT PROJECT IN ODESSA PORT (1246A)

June
17

Traffic studies for interchanges at Gaborone of Botswana

June
17

Public Transport Master Plan of Attica

June
17

Technical consultant services for new LRT system of Tel Aviv

June
17

Technical consultant services for Athens Metro works

Browse

  • Projects
  • About
  • Contact

Follow

  • LINKEDIN
  • INSTAGRAM

Contact

[email protected]
+30 210 64 26 749
ILEKTRAS STREET, 15122, MAROUSI,
ATHENS, GREECE
SIBRAXIS® / © 2023
Powered by Stonewave